A.after the mooring trial has passed
B.before the mooring trial
C.under the surveyors supervision
D.after repair
您可能感興趣的試卷
你可能感興趣的試題
A.cold condition
B.stillness condition
C.certain air pressure
D.the surveyors supervision
A.take a further inspection in the voyage
B.check and repair, then retrial
C.do as the surveyor’s requirement
D.retrial
A.starting
B.torsion vibration
C.direction changing
D.running
A.generator sets running trial
B.shafting intensity trial
C.the trail for pumps that working for ME
D.ME safety devices trial
A.starting and direction changing trial
B.cancelling accelerating function trial
C.lowest stable speed trial
D.continuous running trial
最新試題
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
Using a file without a handle may result in ()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Which of the following items don’t belong to dock repair works?()
Diesel engine air start system check valves are opened by ()
The ISPS Code consists of a mandatory section-Part A, which shows()
Cold weather starting of a diesel engine may be made easier by()
The main purpose of port State control is not to()