A.floors
B.intercostals
C.girders
D.stringers
您可能感興趣的試卷
你可能感興趣的試題
A.longitudinally framed
B.transversely framed
C.cellular framed
D.web framed
A.bottom floor
B.outer bottom
C.shear plating
D.tank top
A.areas where special materials are used
B.hazardous areas
C.location of emergency repair equipment
D.type and strength of materials used
A.any deck below the main deck and above the lowest deck
B.a member that gives fore-and-aft strength
C.made by placing two bulkheads a few feet apart
D.a heavy fore-and-aft beam under the deck
A.trim by the stern
B.trim by the head
C.be on an even keel
D.be tender
最新試題
The function of the bilge keel is to().
What does the proof test load of an anchor chain demonstrate?()
The procedure of strengthening damaged structures on a ship by using wood or steel is called().
The normal tendency for a loaded tanker is to().
Deck beams on a vessel are generally spaced at equal intervals and run().
The decks of a ship are supported by transverse members called().
Floors aboard ship are().
The strength of a deck will be increased by adding().
The garboard strake is the().
The load chart of a crane enables the operator to combine the load radius with boom length to determine the().