A.In the lower level of the pumproom
B.In the middle level of the pumproom
C.In the upper level of the pumproom
D.On the deck outside the pumproom
您可能感興趣的試卷
你可能感興趣的試題
A.weather deck
B.orlop deck
C.shelter deck
D.main deck
A.tripping line
B.tripping bracket
C.norman pin
D.steamboat ratchet
A.two chains of equal length
B.a single nylon pendant rove through a heavy ring free to move on the pendant
C.two long legs of wire rope shackled to a fishplate
D.a single length of heavy chain with both ends secured on deck to welded pad eyes
A.beach
B.deck
C.pier
D.towed vessel
A.a short length of line used for temporarily holding another line
B.a snatch block for handling a topping lift
C.an engine order telegraph
D.the brake on a cargo winch
最新試題
The Customer agrees to pay the full invoiced price,plus all other amounts payable to the()Repairer under these terms and conditions,relating to or arising out of the Works for the Customer.
What danger is presented if a waterspout passes over a ship?()
What is meant by the term TOPPING THE BOOM?()
The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.
The usual method of arranging a line on deck so that it will run out easily without kinking or fouling is().
The Repairer shall be relieved of all obligations under these terms and conditions caused by such all following matters except().
When hoisting a boat on gravity type davits using an electric motor driven winch,the davit arms should be brought up().
You have been towing astern and have just let go the tow.Your deckhands are pulling in and faking the towline by hand on the stern.The most dangerous action to take is to().
Solid waste generation,and electricity and water consumption are costly and have their own set of environmental().
What is TRUE about hoisting operations().