A.Deck area
B.Dining room on board
C.Assembly station
D.Hold
您可能感興趣的試卷
你可能感興趣的試題
A.adjusting the hose supports
B.laying out an excess length of hose on deck
C.tying off the topping lifts and runners to winch heads
D.All of the above
A.at its goose neck to such a extent
B.at it's goose neck to such an extent
C.at it's goose neck for such a extent
D.at its goose neck to such an extent
A.height
B.breadth
C.depth
D.length
A.lift
B.rise
C.elevate
D.hoist
A.Radial
B.Sheath-screw
C.Quadrantal
D.Gravity
最新試題
What is meant by the term TOPPING THE BOOM?()
The vessel or other goods upon which the Works have been carried out must be()from the Repairer’s worksite within 3 days after the invoice date or in accordance with other written notification by the Repairer to the Customer.
The tweendecker has()below the main deck.
What is TRUE about hoisting operations().
You must ensure that lifesaving equipment is().
Which mooring line prevents sideways motion of a vessel moored to a pier().
The terms ceiling and margin plate are associated with the().
Solid waste generation,and electricity and water consumption are costly and have their own set of environmental().
The main advantage and chief characteristic of a Steulchen boom is that it can be().
You are handling a mooring line and are instructed to Check the line.What should you do().