A.Cargo Manifest
B.Certified Crew List
C.Stores List
D.All of the above
您可能感興趣的試卷
你可能感興趣的試題
A.4,based on the breaking strength
B.5,based on the maximum allowable stress
C.6,based on the maximum working load
D.8,based on the normal working load
A.breadth dimension
B.builder's name
C.brake horsepower
D.revolutions per minute
A.Hoist rope is not kinked
B.Multiple part lines are not twisted around each other
C.The hook is centrally located over the load
D.All of the above
A.approved oil-water separating equipment
B.a fixed or portable containment system at the shore connection
C.a spare pump in case the main pump is inoperative
D.at least one outlet accessible from the weather deck
A.sling psychrometer
B.microbarograph
C.anemometer
D.aneroid barometer
最新試題
Which statement is TRUE concerning fuel vapors on a vessel().
A single heavy wire made up for the topping lift is called a().
Your vessel is listing 4° to port and has a short rolling period. There is loose firefighting water in the hull. The ship is trimmed down by the head with one foot of freeboard at the bow. Which action should you take FIRST?()
A “figure eight” knot is used to().
You are ordering ship’s stores. Which statement is TRUE?()
“15 02 41 Semi Double Queen 195 332mm”is a description of().
A stopper is().
Your fireman’s outfit includes a(n)().
A well in the uppermost deck of a shelter deck vessel which has only a temporary means of closing for the purpose of gaining an exemption from tonnage measurement is called a(n)().
A small light tackle with blocks of steel or wood that is used for miscellaneous small jobs is called a().