A.she needs provisions and bunkers immediately after berthing
B.even she will berth here the vessel does not need any provisions and bunkers
C.she will take provisions and bunkers at other berth
D.she needs no provisions and bunkers even after berthing
您可能感興趣的試卷
你可能感興趣的試題
A.putting on a fireman's outfit,if the vessel is so equipped
B.donning a self-contained breathing apparatus,if the vessel is so equipped
C.activating the general alarm and reporting inoperative alarm systems and fire-detection systems
D.refilling and servicing all expended fire extinguishing equipment
A.in a locked cabinet in the machinery space
B.in an unlocked cabinet in the machinery space
C.in a separate and accessible location
D.at a fire hydrant location
A.Cargo Manifest
B.Certified Crew List
C.Stores List
D.All of the above
A.4,based on the breaking strength
B.5,based on the maximum allowable stress
C.6,based on the maximum working load
D.8,based on the normal working load
A.breadth dimension
B.builder's name
C.brake horsepower
D.revolutions per minute
最新試題
A stay is().
Deadweight,which is the cargo carrying capacity of a vessel in tons,is determined by().
“15 02 41 Semi Double Queen 195 332mm”is a description of().
You are requisitioning stores for your tank vessel. What type of matches are permitted aboard?()
Your fireman’s outfit includes a(n)().
Good title to the Goods delivered to the ship shall not pass to the()until full payment for same has been made.
A single heavy wire made up for the topping lift is called a().
The three conditions which cause engine shutdown are overspeed,low lube oil pressure,and().
What is NOT a function of the steam drum of a marine water-tube boiler().
() is true.