A.at its goose neck to such a extent
B.at it's goose neck to such an extent
C.at it's goose neck for such a extent
D.at its goose neck to such an extent
您可能感興趣的試卷
你可能感興趣的試題
A.assuring heavy cargo is stowed low in the vessel
B.checking the vessel's load line calculations carefully
C.inspection of the hold at completion of discharge
D.stowing the cargo which is to be discharge last on the bottom
A.stored safely at the work site until work is completed
B.returned to the paint locker after each use
C.covered at all times to protect from ignition sources
D.stored in a suitable gear locker
A.after double bottoms
B.centerline tanks so tankships
C.fore and after peaks
D.forward double bottoms
A.adjusting the hose supports
B.laying out an excess length of hose on deck
C.tying off the topping lifts and runners to winch heads
D.All of the above
A.large crates or cases
B.small curved items
C.drums
D.filler cargo
最新試題
Manoeuvring information can not be obtained from().
The loading of the ship must be done in accordance with().
When steering by autopilot,how often should the steering be checked?()
Which wind results from a land mass cooling more quickly at night than an adjacent water area?()
The dew point temperature is().
Shipboard Emergency Drills must be carried out at least()on board cargo ship.
Where would you find information about the time of high tide at a specific location on a particular day of the year?()
()is halfway between the forward and after perpendiculars and is reference point for vessel construction.
Which of the following is not a form of precipitation?()
A tide is called diurnal when().