A.a curve of minimum operational metacentric height(GM)versus draught
B.instructions concerning the operation of cross-flooding arrangements
C.the signals or lights being exhibited or sounded
D.all other data and aids which might be necessary to maintain stability after damage
您可能感興趣的試卷
你可能感興趣的試題
A.Certificate of Inspection
B.American Bureau of Shipping Classification Certificate
C.International Convention for the Safety of Life at Sea Certificate
D.Certificate of Registry
A.COLREGS
B.MMS Rules
C.SOLAS Convention
D.Coast Pilot
A.12 months
B.24 months
C.48 months
D.60 months
A.American Bureau of Shipping classification rules
B.International Regulations for Preventing Collisions at Sea
C.Safety of Life at Sea Convention
D.Minerals Management Service rules
A.hot work permit
B.Certificate of Inspection
C.Safety of Life at Sea Certificate
D.station bill
最新試題
When a davit-launched raft is lowered from a ship,upon becoming waterborne,the raft is released by().
What best describes an anchor buoy().
The maximum number of passengers a Vessel may carry().
Cribbing is().
A spanner is a().
In the manufacture of wire rope,if the wires are shaped to conform to the curvature of the finished rope before they are laid up,the rope is called().
When paying out nylon line from around the bitts().
At least()radar transponder shall be carried on each side of every cargo ship of 500 gross tonnage and upwards.
What is an advantage of having wire rope with a fiber core over that of a wire rope of the same size with a wire core().
You are preparing to slush a stay on your vessel by lowering yourself down the stay in a bosun’s chair.The proper way to do this is to ride down the stay on a riding shackle().