A.secure the electric supply
B.ventilate area to remove smoke
C.start the fire pump and lead out hose
D.apply foam
您可能感興趣的試卷
你可能感興趣的試題
A.the circuit being worked on and the location of all switches and circuit breakers controlling it
B.first-aid techniques for treating electrical shock
C.cardiopulmonary resuscitation (CPR)
D.All of the above
A.week
B.2 weeks
C.month
D.3 months
A.De-energize the applicable switchboard bus
B.Bypass the interlocks
C.Secure and tag the supply circuit breaker in the open position
D.Station a man at the circuit supply switch
A.Wear rubber gloves and boots
B.Use only approved non-conducting tools
C.Ground the case of the machine before beginning any repairs
D.Open the supply circuits and tag the switches
A.electromagnetic field, revolving armature type
B.electromagnetic field, oscillatory armature type
C.armature, oscillatory electromagnet field type
D.armature, rotating electromagnetic field type
最新試題
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
The main purpose of port State control is not to()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
The cetane rating of diesel fuel is an indication of the ()
Under MARPOL Code the ship to which it applies has to carry ()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()