A.hose joints are made up
B.tanks are being topped off
C.system is being lined up
D.pumping operation is first started
您可能感興趣的試卷
你可能感興趣的試題
A.Reduce the pumping rate by closing the deck filling valve
B.Close all overflow valves
C.Place 5 gallon containers under all flange connections in the fuel line
D.Reduce the pumping rate and sound tanks frequently as the level rises
A.Increased viscosity of the product needs higher loading pressure, which increases the chances of a spill
B.Air pockets may cause the fuel to bubble out of the ullage hole
C.The temperature rise of the fuel will cause an overflow
D.Fueling valve may become stuck closed and cause the fuel oil to spill before the valve can be opened
A.actuate an alarm and open the engine room control valve
B.actuate an alarm and open the engine room CO2 releasing valve
C.open the engine room control valve and shut off engine room ventilation fans
D.open the engine room control valve and then the CO2 releasing valve
A.to the bottom of the expansion trunk
B.to within 1% to 3% of its capacity
C.to within 1% to 3% inches of its capacity
D.1 to 3 inches from top of the vent pipe
A.draped over the fantail to dry out
B.drained over the side and washed out
C.drained into the bilges and washed out
D.drained into buckets or fuel tanks
最新試題
If separating effect is not good, which measure should be taken ()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
Using a file without a handle may result in ()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
Diesel engine air start system check valves are opened by ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()