A.Ship Survey Bureau
B.CCS
C.Maritime Safety Administration
D.all of the above
您可能感興趣的試卷
你可能感興趣的試題
A.starting
B.running
C.running-in
D.direction changing
A.after the mooring trial has passed
B.before the mooring trial
C.under the surveyors supervision
D.after repair
A.cold condition
B.stillness condition
C.certain air pressure
D.the surveyors supervision
A.take a further inspection in the voyage
B.check and repair, then retrial
C.do as the surveyor’s requirement
D.retrial
A.starting
B.torsion vibration
C.direction changing
D.running
最新試題
The cetane rating of diesel fuel is an indication of the ()
The ISPS Code consists of a mandatory section-Part A, which shows()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
() is not installed on the main switchboar.
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
To proceed to the assistance of a ship in distress is()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()