A.deck edge immersion
B.the load line
C.downflooding
D.loll
您可能感興趣的試卷
你可能感興趣的試題
A.on
B.in
C.at
D.into
A.Deck area
B.Dining room on board
C.Assembly station
D.Hold
A.adjusting the hose supports
B.laying out an excess length of hose on deck
C.tying off the topping lifts and runners to winch heads
D.All of the above
A.at its goose neck to such a extent
B.at it's goose neck to such an extent
C.at it's goose neck for such a extent
D.at its goose neck to such an extent
A.height
B.breadth
C.depth
D.length
最新試題
When a line is spirally coiled about its end and lying flat on deck,it is said to be().
The Chief Petty Officer employed in the repair and maintenance work shall such abilities as to prepare and apply().
What is TRUE about hoisting operations().
The terms ceiling and margin plate are associated with the().
Solid waste generation,and electricity and water consumption are costly and have their own set of environmental().
The margin plate is the().
The process of lowering a boom to a horizontal position and onto its deck support is called().
The tweendecker has()below the main deck.
Any Works completion date quoted by the Repairer is an estimate only and the Repairer shall not be()liable for any failure to complete the Works by that date.
The Repairer shall be relieved of all obligations under these terms and conditions caused by such all following matters except().