單項選擇題()refers to the depth of a vessel below the waterline,measured vertically to the lowest part of the hull,propellers or other reference points.

A.Free board
B.Stability height
C.Metacentric height
D.Draft


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題Your vessel was damaged and initially assumed a significant list and trim; however,further increase has been slow. Based on this data,what should you expect?()

A.The slowing is only temporary and the vessel will probably suddenly capsize or plunge from loss of stability due to change in the waterplane area
B.The vessel can probably be saved if further flooding can be stopped
C.The vessel will continue to slowly list and/or trim due to the free surface effect and free communication effect
D.The vessel will suddenly flop to the same or greater angle of list on the other side and may capsize

2.單項選擇題Your vessel is damaged with no list,but down by the stern. There is progressive flooding and trim by the stern is increasing. What is the effect on transverse stability after the deck edge at the stern is submerged?()

A.KB increases,increasing BM and therefore GM
B.KG increases due to the weight of the added water on deck
C.BM decreases from loss of water plane and greater volume
D.There is no effect on transverse stability

3.單項選擇題What is not usually a concern when loading a single-hulled tanker?()

A.Bending moments
B.Initial stability
C.Draft
D.Trim

4.單項選擇題The two points that act together to trim a ship are the().

A.LCF and LCB
B.LCG and LCB
C.metacenter and LCG
D.VCG and LCG

5.單項選擇題The TPC curve,one of the hydrostatic curves in a vessel’s plans,gives the number of tons().

A.necessary to change the angle of list 1°at a given draft
B.necessary to change trim 1 cm at a given draft
C.pressure per square cm on the vessel's hull at a given draft
D.necessary to further immerse the vessel 1 cm at a given draft